1 \section{The Silicon Strip Tracker Assembly}
2 \label{sec:assembly}
3
4 From the contruction point of view the different tracker sub-detectors are organized in
5 the following way. \\
6 TOB is assembled inserting 'rods' into a mechanical structure which holds them and supports
7 their services. Rods have half of the TOB lenght and are inserted half from the 'z+ side'
8 (called TOB+) and half from the 'z- side' (TOB-). The TOB services are routed outside of its
9 volume from the two flanges where fibres, pipes and cables are $90^\circ$ tilted
10 towards the tracker support tube where they are fixed and routed outside of the tracker at its
11 two ends.\\
12 The TIB is divided into two completely independent parts: TIB+ and TIB-. Each shell is conected
13 with an identical one to build a complete cylinder (Layer); then the four TIB layers are
14 inserted one into the other starting from outside to inside. The TIB services exit the
15 detector volume from the external flange, they are routed radially toward the TIB Layer 4
16 anf then bent on the TID service cylinder up to the patch panel (called 'Margherita').\\
17 Three mechanically separated rings are assembled together to form a TID disk; three disks are
18 inserted in a carbon fibre cylinder which hold them together with thee TID services.
19 The preassembled TID+/- is attached to the TIB+/- and it is also used as support for all
20 the services. \\
21 When each TIB/TID half detector is assembled and validated, it is inserted into the TOB.
22 Then it is connected to the fiber ribbons, pipes and power cables which are routed outside the
23 Tracker Support Tube following the path of the TOB ones.\\
24 TEC disks are made by 'petals'. Also in this case the services run on a TEC disk towards the
25 Tracker Support Tube where they follow the same path. Two TEC (also called TEC+ and TEC-)
26 are inserted in the Support Tube when the barrel part is assembled.\\